[1]
Suhariyanto et al. 2025. Replanning of BC-7 belt conveyor in coal handling system with capacity of 150 tph at Lombok ftp-2 (2x50mw) power plant. Jurnal Nasional Aplikasi Mekatronika, Otomasi dan Robot Industri (AMORI). 4, 2 (Dec. 2025). DOI:https://doi.org/10.12962/j27213560.v4i2.9363.