Suhariyanto (2025) “Replanning of BC-7 belt conveyor in coal handling system with capacity of 150 tph at Lombok ftp-2 (2x50mw) power plant”, Jurnal Nasional Aplikasi Mekatronika, Otomasi dan Robot Industri (AMORI), 4(2). doi: 10.12962/j27213560.v4i2.9363.