Suhariyanto, et al. “Replanning of BC-7 Belt Conveyor in Coal Handling System With Capacity of 150 Tph at Lombok Ftp-2 (2x50mw) Power Plant”. Jurnal Nasional Aplikasi Mekatronika, Otomasi Dan Robot Industri (AMORI), vol. 4, no. 2, Dec. 2025, doi:10.12962/j27213560.v4i2.9363.