Fatigue Analysis of Mid-Water Buoy (MWB) due to Changes in Pipeline End Manifold (PLEM) Position

Authors

  • Ibrahim Rahmatulloh Department of Ocean Engineering, Institut Teknologi Sepuluh Nopember, Surabaya, 60111, Indonesia
  • Handayanu Department of Ocean Engineering, Institut Teknologi Sepuluh Nopember, Surabaya, 60111, Indonesia
  • Nur Syahroni Department of Ocean Engineering, Institut Teknologi Sepuluh Nopember, Surabaya, 60111, Indonesia

DOI:

https://doi.org/10.12962/j25481479.v10i3

Keywords:

Mid-Water Buoy, Fatigue Analysis, Cumulative Damage, Hotspot Stress, Rainflow Counting

Abstract

This research is a case study that will analyze the fatigue life of the Mid-Water Buoy (MWB) structure on the subsea hose string SPM #4 after the installation of New PLEM C, or in other words in conditions where the subsea hose string (including MWB) has been connected to New PLEM C. MWB is one of the ancillary components of the subsea hose string, which has the main function as a buoy to keep the entire subsea hose string at a safe distance to the seabed. By replacing the old PLEM-C with the New PLEM-C, the dynamic motion of the subsea hose when connected to the New PLEM-C will also be different compared to the dynamic motion when connected to the old PLEM-C. As the main input for fatigue analysis, cyclic load analysis acting on the MWB structure is carried out based on a deterministic approach through time domain simulation and continued with the calculation of the number of cycles with the rainflow cycle counting method. For local stress analysis in the critical area of the MWB structure, the hotspot stress method is carried out through the Finite Element Method (FEM) which refers to DNV-RP-C203. Furthermore, the fatigue life calculation is carried out by applying the Palmgren-Miner rules and by utilizing the S-N Curve from DNV-RP-C203. From a series of analyses that have been carried out it was found that the lowest fatigue life value for the MWB structure is occurs at PART B1 (the part of the MWB connected to the Subsea Hose STRING B – Upper) with a value of 145.93 years and with an annual damage ratio of 0.0069 for the Connection between the Vertical Stiffener and the Pipe.

Downloads

Download data is not yet available.

Downloads

Published

2025-12-05

How to Cite

Rahmatulloh, I., Handayanu, & Syahroni, N. (2025). Fatigue Analysis of Mid-Water Buoy (MWB) due to Changes in Pipeline End Manifold (PLEM) Position. nternational ournal of arine ngineering nnovation and esearch, 10(3), 795–811. https://doi.org/10.12962/j25481479.v10i3

Issue

Section

Articles