[1]
Mulyatno, I.P., Humaida, H.N., Amiruddin, W., Adietya, B.A. and Yudo, H. 2025. Application of Time Cost Trade Off Method in Optimizing Time and Cost on Ship Refurbishment Projects KMP Dharma Rucitra 1 and MT Triaksa 17. International Journal of Marine Engineering Innovation and Research. 9, 4 (Jul. 2025), 817–824. DOI:https://doi.org/10.12962/j25481479.v9i4.4844.