[1]
Baroroh, I., Tarigan, E.F., Sumantri, S.H., Azhar, A., Hardianto, D. and Kristiyono, T.A. 2025. Implementation of Material Control in Tugboat Ship Building Using the Lot for Lot (LFL) Method Case Study: (PT.PMP). International Journal of Marine Engineering Innovation and Research. 9, 3 (Jul. 2025), 408–416. DOI:https://doi.org/10.12962/j25481479.v9i3.4898.