[1]
Santosa, A.W.B., Mursid, O., Kalingga, M.A., Ahmad, S.T.P. and Trimulyono, A. 2025. Productivity Analysis Using the Critical Chain Project Method Management (CCPM) on Repair Projects Geomarin-III ship 649 DWT. International Journal of Marine Engineering Innovation and Research. 8, 1 (Jul. 2025), 80–87. DOI:https://doi.org/10.12962/j25481479.v8i1.5531.