[1]
Sa’u, C. and Rosyid, D.M. 2025. Configuration Selection Based on Lifecycle Cost of Subsea Production System: Case of Indonesia Deepwater Field. International Journal of Marine Engineering Innovation and Research. 2, 2 (Jul. 2025), 117–121. DOI:https://doi.org/10.12962/j25481479.v2i2.6113.