Santosa, A. W. B., Mursid, O., Kalingga, M. A., Ahmad, S. T. P., & Trimulyono, A. (2025). Productivity Analysis Using the Critical Chain Project Method Management (CCPM) on Repair Projects Geomarin-III ship 649 DWT. nternational ournal of arine ngineering nnovation and esearch, 8(1), 80–87. https://doi.org/10.12962/j25481479.v8i1.5531