Riandika Putra Rama, Intan Baroroh, & Ali Azhar. (2025). Analysis Of Paint Material Requirements In The S-80 Tugboat Hull Painting Project. nternational ournal of arine ngineering nnovation and esearch, 10(4), 1116–1123. https://doi.org/10.12962/j25481479.v10i4