Baroroh, I. (2025) “Implementation of Material Control in Tugboat Ship Building Using the Lot for Lot (LFL) Method Case Study: (PT.PMP)”, International Journal of Marine Engineering Innovation and Research, 9(3), pp. 408–416. doi: 10.12962/j25481479.v9i3.4898.