Santosa, A. W. B., Mursid, O., Kalingga, M. A., Ahmad, S. T. P. and Trimulyono, A. (2025) “Productivity Analysis Using the Critical Chain Project Method Management (CCPM) on Repair Projects Geomarin-III ship 649 DWT”., International Journal of Marine Engineering Innovation and Research, 8(1), pp. 80–87. doi: 10.12962/j25481479.v8i1.5531.