Baroroh, Intan, et al. “Implementation of Material Control in Tugboat Ship Building Using the Lot for Lot (LFL) Method Case Study: (PT.PMP)”. International Journal of Marine Engineering Innovation and Research, vol. 9, no. 3, July 2025, pp. 408-16, doi:10.12962/j25481479.v9i3.4898.