1.
Siswantoro N, Priyanta D, Ramadhan J, Zaman MB. Implementation of Risk-Based Inspection (RBI) in Condensate Separator and Storage Vessel: A Case Study. IJMEIR [nternet]. 2025Jul.10 [cited 2025Dec.6];6(1):1-10. vailable from: https://journal.its.ac.id/index.php/ijmeir/article/view/5851