[1]
Alfatih, W.M.C. et al. 2026. Responses Analysis of Tubular Joints in Offshore Substation Jacket due to Settlement During the Roll Up Process. International Journal of Offshore and Coastal Engineering. 10, 1 (May 2026). DOI:https://doi.org/10.12962/j25800914.v10i1.9916.