[1]
Bakhri, M.F.A. and Wiguna, I.P.A. 2025. Factors Affecting Cost Performance Completion On Toll Road Projects With Turnkey Contracts. Journal of Civil Engineering. 40, 3 (Dec. 2025), 222–229. DOI:https://doi.org/10.12962/j20861206.v40i3.9311.