Muhammad F. A. Bakhri, & I P. A. Wiguna. (2025). Factors Affecting Cost Performance Completion On Toll Road Projects With Turnkey Contracts. Journal of Civil Engineering, 40(3), 222–229. https://doi.org/10.12962/j20861206.v40i3.8879