Bakhri, M. F. A. ., & Wiguna, I. P. A. . (2025). Factors Affecting Cost Performance Completion On Toll Road Projects With Turnkey Contracts. ournal of ivil ngineering, 40(3), 222–229. https://doi.org/10.12962/j20861206.v40i3.9311