Muhammad F. A. Bakhri and I P. A. Wiguna (2025) “Factors Affecting Cost Performance Completion On Toll Road Projects With Turnkey Contracts”, Journal of Civil Engineering, 40(3), pp. 222–229. doi: 10.12962/j20861206.v40i3.8879.