Bakhri, M. F. A. . and Wiguna, I. P. A. . (2025) “Factors Affecting Cost Performance Completion On Toll Road Projects With Turnkey Contracts”, Journal of Civil Engineering, 40(3), pp. 222–229. doi: 10.12962/j20861206.v40i3.9311.