[1]
Rizal Permadi, M. et al. 2025. Analysis of Temporary Preloading for Bridge Approach Embankment to Eliminate Secondary Compression Case Study: Probolinggo – Banyuwangi Toll Road Construction Project Section 3 STA 40+550. Journal of Infrastructure & Facility Asset Management. 7, (May 2025), 1–14.