[1]
Rumintha Br Barimbing, F., Lastiasih, Y., Wahyudi, H. and Udukha, S. 2025. Analysis of PVD Installation Methods Due to Limited Vertical Clearance in the Lamongan North Ring Road Construction Project Section 1 STA 0+400 to STA 0+426. Journal of Infrastructure & Facility Asset Management. 7, (May 2025), 35–44.