[1]
Rumintha Br Barimbing, F. et al. 2025. Analysis of PVD Installation Methods Due to Limited Vertical Clearance in the Lamongan North Ring Road Construction Project Section 1 STA 0+400 to STA 0+426. Journal of Infrastructure & Facility Asset Management. 7, (May 2025), 35–44.