(1)
Rizal Permadi, M.; B. Mochtar, I.; Endah Mochtar, N.; Kazhimi, R. Analysis of Temporary Preloading for Bridge Approach Embankment to Eliminate Secondary Compression Case Study: Probolinggo – Banyuwangi Toll Road Construction Project Section 3 STA 40+550. JIFAM 2025, 7, 1-14.