(1)
Rumintha Br Barimbing, F.; Lastiasih, Y.; Wahyudi, H.; Udukha, S. Analysis of PVD Installation Methods Due to Limited Vertical Clearance in the Lamongan North Ring Road Construction Project Section 1 STA 0+400 to STA 0+426. JIFAM 2025, 7, 35-44.