Rizal Permadi, M., B. Mochtar, I., Endah Mochtar, N., & Kazhimi, R. (2025). Analysis of Temporary Preloading for Bridge Approach Embankment to Eliminate Secondary Compression Case Study: Probolinggo – Banyuwangi Toll Road Construction Project Section 3 STA 40+550. ournal of nfrastructure ∓ acility sset anagement, 7, 1–14. etrieved from https://journal.its.ac.id/index.php/jifam/article/view/4428