Rumintha Br Barimbing, F., Lastiasih, Y., Wahyudi, H., & Udukha, S. (2025). Analysis of PVD Installation Methods Due to Limited Vertical Clearance in the Lamongan North Ring Road Construction Project Section 1 STA 0+400 to STA 0+426. ournal of nfrastructure ∓ acility sset anagement, 7, 35–44. etrieved from https://journal.its.ac.id/index.php/jifam/article/view/4450