Rumintha Br Barimbing, F., Lastiasih, Y., Wahyudi, H., & Udukha, S. (2025). Analysis of PVD Installation Methods Due to Limited Vertical Clearance in the Lamongan North Ring Road Construction Project Section 1 STA 0+400 to STA 0+426. Journal of Infrastructure & Facility Asset Management, 7, 35–44. https://doi.org/10.12962/jifam.v7i0.22485