Rumintha Br Barimbing, Fanny, Yudhi Lastiasih, Herman Wahyudi, and Sifa` Udukha. 2025. “Analysis of PVD Installation Methods Due to Limited Vertical Clearance in the Lamongan North Ring Road Construction Project Section 1 STA 0+400 to STA 0+426”. Journal of Infrastructure & Facility Asset Management 7 (May):35-44. https://doi.org/10.12962/jifam.v7i0.22485 .