Kukuh Aryandi, S. (2025) “Design of Toll Road Embankment With Secondary Compression Mitigation After Pvd Installation and Solutions For The Probolinggo – Banyuwangi Toll Road Construction Project Package 2 Sta 16+300 – Sta 16+700”, Journal of Infrastructure & Facility Asset Management, 7(1), pp. 57–74. Available at: https://journal.its.ac.id/index.php/jifam/article/view/4370 (Accessed: 27 January 2026).