Rizal Permadi, M., B. Mochtar, I., Endah Mochtar, N. and Kazhimi, R. (2025) “Analysis of Temporary Preloading for Bridge Approach Embankment to Eliminate Secondary Compression Case Study: Probolinggo – Banyuwangi Toll Road Construction Project Section 3 STA 40+550”, Journal of Infrastructure & Facility Asset Management, 7, pp. 1–14. vailable at: https://journal.its.ac.id/index.php/jifam/article/view/4428 (ccessed: 6December2025).