Rumintha Br Barimbing, F. (2025) “Analysis of PVD Installation Methods Due to Limited Vertical Clearance in the Lamongan North Ring Road Construction Project Section 1 STA 0+400 to STA 0+426”, Journal of Infrastructure & Facility Asset Management, 7, pp. 35–44. Available at: https://journal.its.ac.id/index.php/jifam/article/view/4450 (Accessed: 27 January 2026).