Rumintha Br Barimbing, F. (2025) “Analysis of PVD Installation Methods Due to Limited Vertical Clearance in the Lamongan North Ring Road Construction Project Section 1 STA 0+400 to STA 0+426”, Journal of Infrastructure & Facility Asset Management, 7, pp. 35–44. doi: 10.12962/jifam.v7i0.22485 .