[1]
M. Rizal Permadi, I. B. Mochtar, N. Endah Mochtar, and R. Kazhimi, “Analysis of Temporary Preloading for Bridge Approach Embankment to Eliminate Secondary Compression Case Study: Probolinggo – Banyuwangi Toll Road Construction Project Section 3 STA 40+550”, JIFAM, vol. 7, pp. 1–14, May 2025.