[1]
F. Rumintha Br Barimbing, Y. Lastiasih, H. Wahyudi, and S. Udukha, “Analysis of PVD Installation Methods Due to Limited Vertical Clearance in the Lamongan North Ring Road Construction Project Section 1 STA 0+400 to STA 0+426”, JIFAM, vol. 7, pp. 35–44, May 2025.