[1]
Ramadhani, S. , Hardiyanti, F. , Suhardjito, G. , Soelistijono, R.T. and Wahidin, A. 2024. ANALYSIS OF MAN-HOUR REQUIREMENTS AND SCHEDULING FOR FLOATING DOCK REPAIRS. Journal of Marine-Earth Science and Technology. 4, 3 (Feb. 2024), 85–90. DOI:https://doi.org/10.12962/j27745449.v4i3.1064.