[1]
Basuki, M. and Hildawan Mahendra, O. 2021. OPERATIONAL RISK ASSESSMENT SHIP CONSTRUCTION CAUSES MATERIAL IMPORT USING HOUSE OF RISK (HOR) AND CRITICAL CHAIN PROJECT MANAGEMENT: CASE STUDY IN GRESIK SHIPYARD INDUSTRY. Journal of Marine-Earth Science and Technology. 2, 1 (Oct. 2021), 18–22. DOI:https://doi.org/10.12962/j27745449.v2i1.81.