Ramadhani, S. ., Hardiyanti, F. . ., Suhardjito, G. ., Soelistijono, R. T. ., & Wahidin, A. . (2024). ANALYSIS OF MAN-HOUR REQUIREMENTS AND SCHEDULING FOR FLOATING DOCK REPAIRS. ournal of arine-arth cience and echnology, 4(3), 85–90. https://doi.org/10.12962/j27745449.v4i3.1064