Basuki, M. and Hildawan Mahendra, O. (2021) “OPERATIONAL RISK ASSESSMENT SHIP CONSTRUCTION CAUSES MATERIAL IMPORT USING HOUSE OF RISK (HOR) AND CRITICAL CHAIN PROJECT MANAGEMENT: CASE STUDY IN GRESIK SHIPYARD INDUSTRY”, Journal of Marine-Earth Science and Technology, 2(1), pp. 18–22. doi: 10.12962/j27745449.v2i1.81.