[1]
Setyanto , A. and Putra , A.B.K. 2025. Energy Auditing at Block 1 Muara Karang Combined Cycle Power Plant. IPTEK The Journal of Engineering. 4, 3 (Sep. 2025), 38–43. DOI:https://doi.org/10.12962/joe.v4i3.5016.