[1]
Hariyanto, I.R. et al. 2026. Time and Cost Efficiency Comparison of Conventional and Half-Slab Methods in High-Rise Building Construction. IPTEK The Journal of Engineering. 12, 1 (Aug. 2026), 78–93. DOI:https://doi.org/10.12962/j28075064.v12i1.9493.