Hariyanto, I. R. (2026) “Time and Cost Efficiency Comparison of Conventional and Half-Slab Methods in High-Rise Building Construction”, IPTEK The Journal of Engineering, 12(1), pp. 78–93. doi: 10.12962/j28075064.v12i1.9493.