[1]
Metar, R.D.W. , Prajitno, A.F.H. and Zuhdy, A.Y. 2023. The Calculation of Time and Cost Estimation on Implementing Box Girder with Balance Cantilever Method in the Cakung Fly Over Project . Jurnal Transportasi: Sistem, Material, dan Infrastruktur. 4, 2 (Jul. 2023), A202 - A211.