[1]
Saputri, L.D. and Prajitno, A.F.H. 2023. Time and Cost Estimation of Watu Sewu Bridge Construction on the South Cross Road LOT 7 Project Blitar . Jurnal Transportasi: Sistem, Material, dan Infrastruktur. 5, 2 (Jul. 2023), A247 - A253.