Metar, R. D. W. ., Prajitno, A. F. H. . ., & Zuhdy, A. Y. . . (2023). The Calculation of Time and Cost Estimation on Implementing Box Girder with Balance Cantilever Method in the Cakung Fly Over Project . Jurnal Transportasi: Sistem, Material, Dan Infrastruktur, 4(2), A202 - A211. Retrieved from https://journal.its.ac.id/index.php/transportasi/article/view/723