Manuputty, R. S. D. ., & Prajitno, A. F. H. . . (2023). Project Acceleration Analysis Using the Time Cost Trade Off Method in the Phase II Construction of the Serayu Pegalongan – Mandirancan River Bridge, Banyumas Regency. urnal ransportasi: istem, aterial, an nfrastruktur, 5(2), A241 - A246. etrieved from https://journal.its.ac.id/index.php/transportasi/article/view/729