Manuputty, Ranu Saputra Dewa, and Achmad Faiz Hadi Prajitno. 2023. “Project Acceleration Analysis Using the Time Cost Trade Off Method in the Phase II Construction of the Serayu Pegalongan – Mandirancan River Bridge, Banyumas Regency”. Jurnal Transportasi: Sistem, Material, Dan Infrastruktur 5 (2):A241 - A246. https://journal.its.ac.id/index.php/transportasi/article/view/729.