Saputri, Laili Dian, and Achmad Faiz Hadi Prajitno. 2023. “Time and Cost Estimation of Watu Sewu Bridge Construction on the South Cross Road LOT 7 Project Blitar”. Jurnal Transportasi: Sistem, Material, Dan Infrastruktur 5 (2):A247 - A253. https://journal.its.ac.id/index.php/transportasi/article/view/730.