Manuputty, R. S. D. . and Prajitno, A. F. H. . . (2023) “Project Acceleration Analysis Using the Time Cost Trade Off Method in the Phase II Construction of the Serayu Pegalongan – Mandirancan River Bridge, Banyumas Regency”, Jurnal Transportasi: Sistem, Material, dan Infrastruktur, 5(2), pp. A241 - A246. Available at: https://journal.its.ac.id/index.php/transportasi/article/view/729 (Accessed: 21November2024).