Saputri, L. D. . . and Prajitno, A. F. H. . . (2023) “Time and Cost Estimation of Watu Sewu Bridge Construction on the South Cross Road LOT 7 Project Blitar ”, Jurnal Transportasi: Sistem, Material, dan Infrastruktur, 5(2), pp. A247 - A253. Available at: https://journal.its.ac.id/index.php/transportasi/article/view/730 (Accessed: 21December2024).