Isnaini, N. . and Prajitno, A. F. H. . . (2023) “Time Cost Trade Off (TCTO) Analysis by Considering Overtime Working Hours, and Labor Factors on the Outer East Ring Road (OERR) Surabaya Project (STA 0+000 – STA 5+875)”, Jurnal Transportasi: Sistem, Material, dan Infrastruktur, 5(2), pp. A254 - A260. Available at: https://journal.its.ac.id/index.php/transportasi/article/view/731 (Accessed: 21November2024).