[1]
R. S. D. . Manuputty and A. F. H. . . Prajitno, “Project Acceleration Analysis Using the Time Cost Trade Off Method in the Phase II Construction of the Serayu Pegalongan – Mandirancan River Bridge, Banyumas Regency”, JTSMI, vol. 5, no. 2, pp. A241 - A246, Jul. 2023.