Manuputty, R. S. D. ., and A. F. H. . . Prajitno. “Project Acceleration Analysis Using the Time Cost Trade Off Method in the Phase II Construction of the Serayu Pegalongan – Mandirancan River Bridge, Banyumas Regency”. Jurnal Transportasi: Sistem, Material, Dan Infrastruktur, vol. 5, no. 2, July 2023, pp. A241 - A246, https://journal.its.ac.id/index.php/transportasi/article/view/729.